Home Culture

Beijing National Stadium (Bird's Nest/Olympic Stadium)

Beijing National Stadium (Bird's Nest/Olympic Stadium)

Write: Alfreda [2011-05-23]

Beijing National Stadium / Bird's nest

The Beijing National Stadium, also known as the bird's nest was the main track and field stadium for the 2008 Summer Olympics and host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition.

The National Stadium can seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR).

The design of "Bird's Nest" embodied human caring fully, wherever spectators sit, the sightline is about 140 meters from the centerfield.

The "Bird's Nest" hosted the Opening and Closing Ceremonies, athletic events, and football final of Beijing 2008 Olympic Games which was from August 8 to August 24, 2008 and Beijing 2008 Paralympics from September 6 to September 17, 2008. After the Olympics, the stadium would continue to host international and domestic sporting events, such as football.