Artificial turf surface construction technology

Artificial turf surface construction technology

Write: Hanya [2011-05-20]
Description:
Artificial turf surface construction technology programs
First, pre-construction preparation: together with the Party, on the basis of stadium construction required for acceptance.
1, the number of acceptance of artificial turf, appearance quality, computer typesetting map, interface with, adhesives, small tools and related documents. Involved in several types of work, multi-unit construction should transfer record signing.
2, playgrounds geometry inspection. Whether the design, construction requirements.
3, flatness check, check with the Tolerance 6m square feet shall not exceed 4mm, 1m square foot inspection tolerances shall not exceed 3mm. Honeycomb surface may not have not have cracks. Formation of the Department, if not, then use the adhesive patch enhanced asphalt emulsion obvious venue rugged Department, until the compliance date.
4, the golf course construction drawings within the slope meet the requirements.
Second, the construction phase:
1 approach of construction workers, and familiar with the environment, to comply with relevant rules and regulations of the Education Party.
2, in accordance with the fundamental elements of design drawings to verify the baseline, the relative make-inch map type, found in error or uncertainties, immediate cessation of construction, notify the technology sector. After the pay-off by the technical department is responsible for accurate and verified only after the construction
3, officers approach, the classification of the artificial lawn clean-up.
4, clean venue.
5, check whether the site put in place in the empty position.
6, if the plastic track, the first paved infield grass, and then laying the track and the outer plastic lawn.
7, according to space use and design requirements determined on the basis of pavement marking line. Mark lines of different sports to determine should be consistent with the requirements of competition or practice.
8, mark lines as the base, first laying sideline, end line to limit line, line, service line, free throw line arc and so on, all kinds of line width must comply with the rules or the design of sports competition in the provision.
9 rolls of artificial turf open, straight and leveled, straightened, and then recapture the base fabric. Base fabric into place, then gently turn over gluing, bonding. The gluing seam width of not less than 100mm. Even as the overall post.
10, artificial turf when wet, shall not be connected operations to be opened, and dried before they are allowed to bond.
11, go to work every morning to work on the case yesterday, it was discovered shelter points, the rectification immediately to ensure the quality and then processes the next.
12 and lawns laid out, then carry out full of sand, spreading evenly, and then repeatedly paving machinery with sand, away from the outer circle inwards of each circle to overlap 300mm.
13, artificial turf all completed, again using special equipment to be filled or push both quartz sand (soccer plus black rubber particles), so that precipitation and beautifying the overall effect of artificial turf. 14, construction site safety in a civilized construction.
Third, the construction is completed
1, cleaning the waste generated during construction, and transported to designated locations.
2, with the Party organizations, construction site inspection.
3, providing the proper use and maintenance of artificial turf way signs.
4, artificial turf construction inspection methods
1, artificial turf and color, no obvious joints, no significant level.
2, artificial turf seams stick firmly without cracking, distortion, from the fold.
3, uniform sand replenishment effect, lines meet the drawing requirements, tolerance in the allowable range.
4, in charge of works and the acceptance of a single Party responsible person. Drainage: the drainage system after two hours in the rain water to be discharged.
Maintenance period: 28 days basic warranty period.
Schematic diagram of asphalt base
Plastic surface layer / Artificial Turf
3CM thin asphalt
4CM thick asphalt
15CM asphalt layer
20CM gravel ingredients
Site preparation and excavation waste soil