Endurable floor construction team and requirement
Write:
Egeria [2011-05-20]
Wear resistant construction requirements construction team
1, engineering construction, no matter who is taking over, as far as possible work to do before, can not drag the shift change (every six hours for the class), the class can be done to complete as much as possible, to do his duty. And the Department of shift guides check before work (check not, be extended to do construction work so far) to take the lead role players to do well, can not put on airs, to do the job that, in principle.