The five pieces of equipment covered under the present transport project reach 11.2 hundred tons in weight and RMB 143 million in value; with the heaviest piece weighing 337 tons and the longest piece extending to 38 meters, which will be loaded at Dalian Port and carried to the designated place via the Huangpu Basin of Guangzhou Port. The whole procedure covers offshore transport, transshipment, inland river transport, highway transport, craning, terminal renovation and full-distance cargo insurance etc,totaling more than 4000 kilometers, and will be completed by the end of July.
The bidding success is a direct result of the big customer and strength-improving strategy of the head corporation, and indicates that Sinotrans Liuzhou s project logistics and service brand have gained high customer recognition.