On January 15, the first batch of 70 ore wagons was delivered into Mongolia. They are designed and manufactured by CNR Qiqihar Railway Rolling Stock Co., Ltd.
The technical specification is as follow:
Tare weight 21.7 t
Loading capacity 72.0 t
Effective capacity 43.0 m3
Length 11,820 mm
Design speed 120 km/h
Track gauge 1,520 mm