From September 14th to 16th a GMP inspection team consisting of three members from the SFDA carried out a field inspection on the North Line Utility System (for processing water, steam and HVAC etc.) , QA, QC managment, storage management and key positions in production operation which is located on the third floor of Workshop 301.
The inspection team randomly selected relevant production records, inspection records, deviation management, self inspection documents, OOS, OOT, and SOPs and after careful reviewing concluded that HISUN's production and quality management systems are all sound. As a result, the workshop successfully passed the GMP inspection.