Qin Shan Nuclear Power Station blanks preparation successfully fininshed in CFHI
Write:
Cayden [2011-05-20]
In the evening of 26th May, the 248 tons steel ingot of incore part for Qin Shan Project Phase shell body was successfully finished in the ways of vaccum casting in metallurical workshop. Up to now, all of the blanks of main pressure containing parts, such as nozzle flange etc, for Qin Shan project have been prepared successfully.