Home Facts industry

2015, oil and gas pipeline capacity increase of oil operations

2015, oil and gas pipeline capacity increase of oil operations

Write: Ulalia [2011-05-20]

August 3, Deputy General Manager of China National Petroleum Corporation, said Bao-Cai Yu, 2015, oil and gas operations in the oil pipeline will reach the total mileage of 100,000 km. After 40 years of construction, now the oil has formed across the East and West, from north to south, covering the whole country, the domestic oil and gas overseas connectivity backbone pipeline.

Yu Bao-Cai said that the current pipeline has become the railways, highways, waterways, air transport after the fifth-largest transportation industry.

As of the end of 2009, PetroChina operates 70% of our crude oil pipeline, 90% and 50% of natural gas pipeline pipeline, pipeline operating over more than 50,000 km of total mileage.

China National Petroleum Corporation Pipeline Secretary Zhao Jian said China oil pipeline to speed up the development of business is entering an important period of strategic opportunities and the peak of the new round of construction, pipeline construction full speed.B line of the Central Asian natural gas pipeline, natural gas second-tier East, Lan Zheng Long, Shaanxi and Beijing in line, Shibuya ninglam double-track and other key projects and accelerating, China and Myanmar Oil and Gas Pipeline domestic section, central defender - natural gas pipeline Guiyang, Lanzhou - Chengdu oil pipeline, Jinzhou - Zhengzhou pipeline will be launched one after another, the Central Asian gas pipeline double-track, four-Shaanxi-Beijing natural gas from three-to six-lane and a number of west-