China: Formosa eyes turnaround of no.3 cracker in Q3, 2011
Write:
Jasper [2011-05-20]
An industry source based in Far East Asia informed a polymerupdate team member on the shutdown plans of a No.3 cracker operated by Formosa Petrochemicals, Taiwan.
The source said, "located at Mailiao, Taiwan, the No.1 cracker has a production capacity of 700,000 mt/year. The company also operates the No.2 and the No.3 crackers, at the same site, with production capacities of 1 MMT/year and 1.2 MMT/year respectively."
The source added, "the company has scheduled a maintenance turnaround at the no.3 cracker in the third quarter of next year. The cracker will be taken offstream in September. Exact duration of the shutdown remains unclear.