The main project of Xiangshuijian Power Dam was finished on Oct.22. Situated at E'qiao town of Sanshan District, Wuhu City, the dam is designed as 520 meters long and 88 meters high with an investment of 3.8 billion yuan. The total storage capacity of the reservoir can reach 17.48 million cubic meters. The dam is to pump water in March of next year and expected to put into commercial operation in the end of next year.