On 19th November 2010, CCCC Second Harbor Engineering Co., Ltd. won Liucun connecting line project of Jiangmen-Zhaoqing Road. The bidding price amounted to RMB140 million with construction period of 420 days.
This project is a connecting line between Jiangzhao Expressway and Guangzhou Expressway. It is 13.9km long with dual two-lane. It mainly consists of roadbed, road surface, bridge, culvert, drainage, protection and greening construction.