Home Facts company

Two subway projects are won by CCCC Tunnel Engineering Co., Ltd.

Two subway projects are won by CCCC Tunnel Engineering Co., Ltd.

Write: Tujan [2011-05-20]
Recently, CCCC Tunnel Engineering Co., Ltd. won two subway projects with total contract value of RMB743 million, namely Section D3-TA12 of Nanjing Subway Line 3 and Section TJ2109 of Ningbo Subway Line 2.
Nanjing Subway Line 3 is 44.8km long with 29 stations. Section D3-TA12 is 1973m and composed of two stations and two tunnels. The construction period is 34 months. Phase I of Ningbo Subway Line 2 is 28.35km long with 22 stations.
Section TJ2109 is composed of one station, two shield tunnels, one open trench tunnel, and one U-shaped Groove tunnel. The construction period is 38 months.