Vice President Mr Xue Jilian Visited Baoshen Line for Work Inspection
Write:
Nima [2011-05-20]
After inspecting construction site of Zhuanlongwan tunnel, Mr Xuan required that Zhuanlongwan tunnel must make progress at the premise of safety and quality; the construction team should continue to enhance the quality management, backfill the tunnel which has been finished in a scientific way, pay more attention to water-proof building and strengthen the control on the building technology in order to build a tunnel with solid inner part and beautiful external surface.